Nuclear Technology
- Share via
It is not hard to see that the United States will need new base-load power plants started in the next five years. If funds were committed now for a prototype gas-cooled reactor, it would still be 2005 before the first utility order of a standardized module would be possible. And that is for operation by 2010. The nation cannot wait that long.
I do not know if the nation will need more weapons material. But if we do, using a weapons production reactor as a prototype seems backwards. If it is needed, logic says to build a proven design for that purpose. If gas-cooled reactors have potential for civilian power, somehow Congress must be convinced to appropriate $1 billion for a prototype. But an essential national security requirement does not seem to be the place for a safety test program.
ROBERT M. LUNDBERG, Los Altos
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.